Timber frame and SIPs construction

Find out more about our services and products for developers and commercial projects.
Case Study Developer Virido7

Services for developers

Discover the benefits of our prefabricated timber-frame closed-panel wall systems and structural insulated panels (SIPs). Built offsite in a controlled factory environment with a comprehensive certified integrated management system.

download the brochure

Build with confidence

Learn more about our services to support developers and commercial projects: 

  • Designated design co-ordinator. To get the most out of your chosen build and ensure it delivers the best value for your budget and project needs
  • Technical expertise. Access to our team’s technical knowledge and structural input and any questions you may have.
  • Regulatory compliance. Making sure you have the right solution to meet relevant building regulations and project requirements.
  • Structural calculations. We’ll handle the structural calculations for your timber frame or SIPs project, ensuring its stability and safety.
  • Construction guidance. Advice relating to the superstructure that may arise during the project
Biddenham International School 003

Offsite construction for an efficient build

Offsite construction for housing developments and commercial construction has a number of benefits:

  • Build accuracy. Ensures components are built to exact specifications in a controlled factory environment
  • Less on-site disruption. Each component of the panel is constructed and assembled offsite, from the external breathable membrane to the internal timber service battens. 
  • Reduced on-site labour. With a large proportion of the build manufactured offsite compared to traditional methods of construction
  • Less waste. Prefabrication minimises on-site cutting and construction reducing waste and disposal costs.

Contact us to discuss your project

Send us your drawings or get in touch to discuss your project. Together, we'll understand your budget and the required building performance to recommend the best system fo your needs.

Contact us
KTS Contact Us

Discover our range of products and services

Find out more about our technical and on-site support to help deliver your project.

  • Timber-frame and SIPs build systems that meet and exceed building regulations
  • Architects Guide - a comprehensive set of details for our build systems, which illustrate the interaction of our frame with other elements of the build
  • Appointed design coordinator and contracts manager
  • Superstructure engineering for the frame, including early preparation of line and point load information to enable foundation design to commence
  • U-values, condensation risk and thermal bridging calculations prepared by our technical team
  • An extensive suite of fire resistance test reports from accredited laboratories confirming the performance of our systems
  • Offsite Fire Risk Assessment (OSFRA) and any necessary mitigation products
  • Quality-assured manufacturing with multiple ISO certifications
  • Structural Timber Association approved erectors
  • Provision of site mechanical handling and fall prevention systems

Get a head start in the early stages of your project with our expertise. You'll be able to leverage our knowledge across a wide range of scheme types and sizes to help make early informed decisions. 

KTS Architect Computer 002

A collaborative approach to design and build

Our build systems are supported by our own Architects Guides,  with technical support to save time, reduce cost, and ensure compliance. This includes:

  • Standard construction details for all our systems with specialist support from our design co-ordinators for more complex constructions
  • Fire resistance test evidence for the wall constructions you are using to reduce your risk and ensure regulatory compliance.
  • U-value, condensation risk and thermal bridging calculations, prepared by our in house technical team for your project.

Guiding you through our build process

01

Get in touch!

Send us your drawings and we'll discuss your project in detail, understanding your budget and building performance requirements.

KTS Step 001
02

Receive your quote

We'll ensure everything aligns to your expectations and requirements, with early support through our technical team.

KTS Receive Quote 002
03

Optimising your design

Our design coordinators will collaborate with your team to progress the structural calculations including loading information.

KTS Architect Computer
04

Manufacturing stage

The design moves to the manufacturing stage, including a short phase of procurement for bespoke items.

KTS Step 004
05

Delivery and erection

Your dedicated contract and construction team will start work on-site, completing in line with the agreed programme.

KTS Step 005
06

Handover and support

We'll conduct a final sign-off procedure and formal handover, with support from our contract and technical team.

KTS Superstructure Interior
Video Thumbnail Play video

Why I worked with Kingspan Timber Solutions

Kingspan Timber Solutions provided the timber frame system, Kingspan ULTIMA for 3 homes I built in Northamptonshire, they made the whole process simple from to finish.
Roger Bettley, Developer

Contact Us
"Kingspan Timber Solutions provided the timber frame system, Kingspan ULTIMA, for 3 homes I built in Northamptonshire, they made the whole process simple from start to finish."

Roger Bettley, Developer

"The high degree of skill and expertise consistently demonstrated by the Kingspan team provided us with a great deal of confidence in the delivery of an incredibly challenging project, both in terms of scope and scale."

Paul Gransby, Construction Director, ISG

"Kingspan’s solution driven approach was an important factor in our successful relationship, and the company’s ability to plan ahead and offer us a transparent working methodology, with clearly defined processes, provided enhanced certainty in programme delivery. This made project management much more straight forward and Kingspan actively contributed to the smooth running of the programme."

Paul Gransby, Construction Director, ISG

"Kingspan Timber Solutions were very good. They did what they said they would and never failed. And for someone in a position like mine, that's a great help."

Stan Smith, ISG Project Manager

"Kingspan Timber Solutions have been our top timber frame supplier for a number of years. They were open in terms of the use of layouts, and their flexibility is an important part of the relationship we've had with them. We know they are capable in both design and engineering and flexible in the service we require from them."

Paul Jordan, Operations Director, Hill

"The Kingspan build system suits us well because it enables us to progress quickly to a watertight shell which is a crucial build phase for us as it allows access to further finance, and to then work inside and outside the build simultaneously reducing construction time."

Tim Warner, Cormorant Ltd

"The build was highly successful, even with the constraints of a compact site. Offsite construction played a crucial role in enhancing efficiency and reducing on-site complexities. The team’s hard work was widely appreciated, earning commendation from Tendring District Council."

Paul Willey, Rose Builders

Contact us about your project

Drag and drop files here or click to upload

    By pressing the Submit button below, I consent to the terms of the Website Privacy Notice.